- Mr. John Satish – Convener
- Mr. George Pearson
- Mr. Ivan Benn
- Maj Gen Surender Pavamani
- Mr. Immanuel Felix
- Mr. Joseph Davaraj
- Mrs. Jisha John
- Mr. Ajay Koshy
- Mr. Immanuel Nicholas
- Rev. Dr. Vincent Vinod Kumar, Presbyter-In-Charge
- Mrs. Christy Joseph – Secretary
- Mr. Joseph Davaraj – Treasurer
- Mr. Stephen Azariah – Convenor
- Rev. Dr. Vincent Vinod Kumar, Presbyter-In-Charge
- Prof. Hephzibah Doss – Secretary
- Mr. Deepak George Pothan – Treasurer
- Mr. Leslie Pearson – Convener
- Mr. Vivian Victor
- Mr. Jagadish Arthur
- Mr. Solomon
- Wg Cdr C. J. Premvardhan
- Mr. Willington Prabhahar
- Mr. V. S. Prabhakar
Sub-Committee Member for the period 2011-2013
- Rev. Moses Jayakumar – Chairman
- Mr. Joseph Davaraj – Convener
- Mr. Samuel Mohan – Secretary
- Mr. Mathew Isac – Treasurer
- Mr. Jagdish Arthur
- Mr. Leslie Pearson
- Col. E. W. Benjamin
- Mr. Kamalesh Dutt
- Mr. B. N. Prasanna
- Mr. Emerson Samuel
- Mr. Leslie Pearson
- Mr. C. T. Raj
- Mr. E. D. George
- Mr. Rajkumar
- Mr. Immanuel Nicholas Iyadurai
Members
- Mr. John Satish
- Mr. Leslie Pearson
- Mr. Sujay Kuruvilla
- Mr. Jawahar Abraham
- Mr. Reji Thomas -Convener
Jobs Completed
- Roof repair of parsonage and painting.
- Bore well pump replaced and commissioned.
- The cross lighting on both the crosses on top of the church as well as the one facing M.G. Road have been reparied.
- Sunday school grill work.
- New sump for the parsonage.
- New sump built near the toilet.
- Painting of resource centre.
- Stone skirting created all around on all floors of the resource centre.
- All carpets in the church changed both in all the isles as well as the altar.
- Painting of old age home units.
- Cross Light repaired.
- Annual Maintenance Contract for the resource centre lift has been negotiated and signed.
- Plastering behind Parsonage and painting the road facing wall and exteriors.
- Parsonage roof that has been leaking has been re-done and the entire parsonage has been repainted.
- Creation of an estate maintenance record for all buildings.
- Pest control agency contracted to proctet the pipe organ against rodents,Also to carry out periodical pest control work of the other buildings on the premises.
- Missing brass carpet raisres have been replaced.
- All kneelers in front of the altar have been repaced.
- Two of the existing staff quarters have been completely renovated and water proofing has been done for the roof to accomadate one more staff on the premises.
Pending Works
- Periphery security lighting of the church compound with motion sensors to be installed Trial order has been given.
- Ground floor of the parsonage to be renovated and converted into a guest house for visiting clergy or anyone else.
- P.A. system to be revamped. Quotations have been procured, the work ordre to be issued.
- Security fencing for the entire compound to be done keeping in mind the existing architectural style of the church, sample of the fencing erected behind the parsonage.
- Extension and enclosing of the church’s porch area to accomadate the overflow during Sunday worship, architect has been contacted to give a design which will blend with the existing church’s architecture.
- All pew seats require to be replaced with fresh cane weaving that is being treated with top priority.
- New overhead sintex tank 2000 lit. capacity to be installed over the parsonage as the existing masonry tank is leaking.
- Mansonry enclosures to be made to house 2 pumps and the music school generator.
- Procurement of additional fire extinguishers for the church and refilling of the existing ones if out dated.